Day 32 - Running water!
- ballerbus
- Dec 6, 2018
- 1 min read
December 4th 2018
A slow day for traveling today, but it was an effective full day of work! Sam hooked up the bike rack support on tee back deck. After we were able to clear out our closet (shower) I was able to glue all the plumbing and get cold AND HOT water running without a leak!!! For someone that hasn't ever glued a drain pipe I consider that lucky! Good thing too since if it did leak Josh's stuff would smell more than it already does...

Comments